This website uses cookies. The website depend on cookies to function properly. The cookie will dissappear as soon as you clear or close your browser. Read more about cookies

Incident with passenger ship FINNTRADER at sea outside Travemünde

S-35/14
Date of occurrence: 2014-03-10

A drift failure occurred in the engine control system on the passenger ship FINNTRADER. This resulted in a near black-out during a voyage with a pilot on board while leaving Travemünde.

The source of the failure was that a switch between the shaft generator and the ship’s power supply did not give a positioning signal to the control unit of the shaft generator, which resulted in an automatic attempt to switch power from the ship’s auxiliary engines to the shaft generator. This lead to the automatic system trying to change the electrical load to a generator, at the time not connected to the same system, which caused frequency failure and high currents, resulting in de-energizing of non-essential systems.

This was one of several near-misses of the same kind that has happened on the ship during the last 14 month period. Hence, SHK has decided to investigate the circumstances for these occurrences and how they are handled by authorities and classification societies.


Chairperson
Helene Arango Magnusson
Investigator in charge
Jörgen Zachau

Latest investigation updates


2016-10-07 SHK´s assessment of Finnlines Ship Management AB´s response to SHK´s safety recommendations
2016-10-07 Response from Finnlines Ship Management AB to SHK`s safety recommendations
2016-10-03 SHK:s assessment of DNV GL response to SHK`s safety recommendations
2016-10-03 Response from DNV GL to SHK´s safety recommendations
2016-10-03 SHK´s assessment of The Swedish Transport Agecy´s response to SHK´s safety recommendations
2016-10-03 Response from The Swedish Transport Agency´s to SHK`s safety recommendations
2016-10-03 Summary and Safety recommendations
2016-04-13 Final report
Final Report RS 2016:03 with summary and recommendations in English
2015-03-10 FINNTRADER - RS 2015:01

Print
Investigation started
Fact-finding phase
Stakeholder meeting held
Analyzing phase
External consultation process closed
Final report published
Recommendation handling underway
Recommendation handling closed
Subscribe to information on when an investigation has been updated. Choose your area of interest and fill in your e-mail address.